Sign in Subscribe

Sewer Commission approves two sewer connection requests at April meeting

Sewer Commission · Meeting of April 9, 2026

TYNGSBOROUGH — Sewer Commission approves two residential sewer connections without opposition. Chair Brian J. Martin and members Frederick H.

Perrault and Darryl Wickens unanimously voted to allow 1 Ferry Lane to draw reserve flow from Flint's Corner for a single-family renovation, and to permit a detached ADU at 5 Joco Drive to connect through the existing house line to an E1 pump station, subject to engineer review. In other business, Sewer Administrator Kathy Cayer declined to referee a private dispute between Bridlevale and an abutter over access to a pump station; the commission is two weeks into an eight-week I/I monitoring plan with 10 days of CCTV inspection scheduled.

In the full story:

  • The complete report — 367 words

Source: the Sewer Commission meeting of April 9, 2026, reported from the official video recording and transcript.

Keep reading with a 14-day free trial

Subscribe to Tyngsborough News to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to Tyngsborough News

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe